Phase 1 drilling commenced at the Highway Nickel deposit in March 2022. The program is targeting shallow Ni-Co-Cu-Pd mineralisation identified in historical exploration. The resource definition drilling is focused on progressing towards a JORC 2012 Mineral Resource Estimate that will be used as the foundation for further development and pre-feasibility studies.
PHASE 2 DRILLING UNDERWAY (27/07/22)
Second Major Drilling Program Underway at Pardoo
MORE SHALLOW NI-CO-CU-PD MINERALISATION AT PARDOO (28/06/22)
Final Assay Results from Phase 1 RC drill program
SIGNIFICANT SHALLLOW MINERALISATION INTERSECTED AT PARDOO (07/06/22)
Results from first 45% of RC drilling program.
PHASE 1 DRILLING COMPLETED AT PARDOO (11/04/22)
Phase 1 drilling program completed.
The pilbara region was moved into the spotlight during 2020 with major discoveries in the region paving the way for further exploration.
The area within Caeneus’ tenements covers a significant portion of the highly prospective Goldsworthy Greenstone belt. Other base metals occurrences located within the Pardoo Shear zone on E45/4671 signify the potential for additional discoveries along and across strike to the Highway Deposit.
Caeneus Minerals Ltd
Ground Floor
168 Stirling Hwy
Nedlands WA 6014